Vol 22 No 7 (2016)
Published: 2016-07-12
Articles
Maximizing the value of residential projects using fuzzy rule based linear programming
Abstract 591 | PDF Downloads 1105 | DOI https://doi.org/10.3846/13923730.2014.914102
Page 853-861
Evaluating motivation of construction workers: a comparison of fuzzy rule-based model with the traditional expectancy theory
Abstract 1595 | PDF Downloads 2378 | DOI https://doi.org/10.3846/13923730.2014.914103
Page 862-873
Study on correlation between fire fighting time and fire loss in urban building based on statistical data
Abstract 692 | PDF Downloads 604 | DOI https://doi.org/10.3846/13923730.2014.914101
Page 874-881
Linear and nonlinear fractional hereditary constitutive laws of asphalt mixtures
Abstract 881 | PDF Downloads 585 | DOI https://doi.org/10.3846/13923730.2014.914104
Page 882-889
Establishing engineering S-curves to evaluate supervision engineer allocations for highway construction projects
Abstract 760 | PDF Downloads 1095 | DOI https://doi.org/10.3846/13923730.2014.928363
Page 890-902
Developing construction defect management system using BIM technology in quality inspection
Abstract 2145 | PDF Downloads 2462 | DOI https://doi.org/10.3846/13923730.2014.928362
Page 903-914
An insulation thickness optimization methodology for school buildings rehabilitation combining artificial neural networks and life cycle cost
Abstract 764 | PDF Downloads 662 | DOI https://doi.org/10.3846/13923730.2014.928364
Page 915-923
Fuzzy method for analysing uncertainty in the sustainable design of concrete structures
Abstract 928 | PDF Downloads 649 | DOI https://doi.org/10.3846/13923730.2014.928361
Page 924-935
Information platform to improve technological innovation capabilities: role of cloud platform
Abstract 735 | PDF Downloads 629 | DOI https://doi.org/10.3846/13923730.2014.929023
Page 936-943
Time reduction effect of the enhanced TACT method for high-rise residential buildings
Abstract 645 | PDF Downloads 621 | DOI https://doi.org/10.3846/13923730.2014.945949
Page 944-953
Government motivation-embedded return guarantee for urban infrastructure projects based on real options
Abstract 694 | PDF Downloads 523 | DOI https://doi.org/10.3846/13923730.2016.1204362
Page 954-966
Proposing a neural network model to predict time and cost claims in construction projects
Abstract 1526 | PDF Downloads 1216 | DOI https://doi.org/10.3846/13923730.2016.1205510
Page 967-978
Corrigenda
Corrigendum
Abstract 515 | PDF Downloads 364 | DOI https://doi.org/10.3846/13923730.2016.1203479
Page 979