Vol 25 No 3 (2019)
Published: 2019-03-01
Articles
The cost performance and causes of overruns in infrastructure development projects in Asia
Abstract 3833 | PDF Downloads 2590 | DOI https://doi.org/10.3846/jcem.2019.8646
Page 203-214
An investigation into working behavior characteristics of parabolic CFST arches applying structural stressing state theory
Abstract 1196 | PDF Downloads 735 | DOI https://doi.org/10.3846/jcem.2019.8102
Page 215-227
Patent cooperative patterns and development trends of Chinese construction enterprises: A network analysis
Abstract 1859 | PDF Downloads 1005 | DOI https://doi.org/10.3846/jcem.2019.8137
Page 228-240
Solving construction project selection problem by a new uncertain weighting and ranking based on compromise solution with linear assignment approach
Abstract 2096 | PDF Downloads 1022 | DOI https://doi.org/10.3846/jcem.2019.8656
Page 241-251
Why conflicts occur in roads and tunnels projects in Norway
Abstract 1691 | PDF Downloads 1027 | DOI https://doi.org/10.3846/jcem.2019.8566
Page 252-264
Concession model for fair distribution of benefits and risks in build-operate-transfer road projects
Abstract 1442 | PDF Downloads 952 | DOI https://doi.org/10.3846/jcem.2019.8649
Page 265-275
Project external environmental factors affecting project delivery systems selection
Abstract 1992 | PDF Downloads 4594 | DOI https://doi.org/10.3846/jcem.2019.7460
Page 276-286
Behaviour of vertical cylindrical tank with local wall imperfections
Abstract 932 | PDF Downloads 631 | DOI https://doi.org/10.3846/jcem.2019.9629
Page 287-296