Scheduling construction projects with resources accessibility limited and changeable in time

    Piotr Jaśkowski Affiliation
    ; Anna Sobotka Affiliation

Abstract

This paper aims at solving the problem of minimising the construction project duration in deterministic conditions when the accessibility of renewable resources is limited and changeable in time (workforce, machines and equipment). Particular construction processes (with various levels of complexity) must be conducted in the established technological order and can be executed in different technological and organisational variants (different contractors, technologies, and ways of using resources). To solve this problem the authors are using evolutionary algorithm. For the assessment of solutions generated by evolutionary algorithm, the authors have worked out a heuristic algorithm (of resources allocation and project duration calculation). This methodology seems to produce similar outcomes when juxtaposed with other solutions obtained by research works carried out using comparable methodologies. The paper contains an example of practical application of evolutionary algorithm for construction project planning within resources and time constraints.


First Published Online: 14 Oct 2010

Keyword : project scheduling, time and resources constraints, evolutionary algorithm, metaheuristic methods, suboptimal solution, minimising project duration

How to Cite
Jaśkowski, P., & Sobotka, A. (2004). Scheduling construction projects with resources accessibility limited and changeable in time. Journal of Civil Engineering and Management, 10(4), 267-276. https://doi.org/10.3846/13923730.2004.9636319
Published in Issue
Dec 31, 2004
Abstract Views
492
PDF Downloads
381
Creative Commons License

This work is licensed under a Creative Commons Attribution 4.0 International License.