[1]
Enshassi, A., Mohamed, S. and Abushaban, S. 2009. Factors affecting the performance of construction projects in the Gaza strip. Journal of Civil Engineering and Management. 15, 3 (Sep. 2009), 269-280. DOI:https://doi.org/10.3846/1392-3730.2009.15.269-280.